How a survey and a few measurements become a permit-ready site plan.
Six guided steps: import what you have, calibrate the drawing, confirm existing conditions, add the proposed work, run readiness checks, and export a scaled sheet your municipality can read.
Interactive workflow
Step 3 of 6 · Confirm existing
Live geometry
Confirm existing
The complete path
The drawing always tells you what comes next.
Select a step to see the plan change and understand the decision you are making at that point.
Live geometry
Confirm existing
Review the lot and existing structures
Confirm or correct every detected boundary and footprint instead of accepting an automated guess.
Flexible starting point
A survey helps, but it does not block the first step.
Start with the most reliable source available. The workspace keeps the source and its verification state visible throughout the plan.
Property survey
Best for established boundaries and labelled dimensions.
Plot or parcel plan
Useful property context that may still need verification.
Measured sketch
A practical start when dimensions were collected on site.
Manual dimensions
Build a blank lot and clearly retain user-entered responsibility.
Free to build and preview
Bring the property information. Build the plan with confidence.
No credit card · No CAD experience · Pay when you need a clean export