From source document to scaled plan

How a survey and a few measurements become a permit-ready site plan.

Six guided steps: import what you have, calibrate the drawing, confirm existing conditions, add the proposed work, run readiness checks, and export a scaled sheet your municipality can read.

No CAD requiredPreview before purchaseEvery key input stays reviewable

Interactive workflow

Step 3 of 6 · Confirm existing

Try each step
CEDAR AVENUE60.00 ftEXISTING HOUSE

Live geometry

Confirm existing

The complete path

The drawing always tells you what comes next.

Select a step to see the plan change and understand the decision you are making at that point.

CEDAR AVENUE60.00 ftEXISTING HOUSE

Live geometry

Confirm existing

3

Review the lot and existing structures

Confirm or correct every detected boundary and footprint instead of accepting an automated guess.

Flexible starting point

A survey helps, but it does not block the first step.

Start with the most reliable source available. The workspace keeps the source and its verification state visible throughout the plan.

01

Property survey

Best for established boundaries and labelled dimensions.

02

Plot or parcel plan

Useful property context that may still need verification.

03

Measured sketch

A practical start when dimensions were collected on site.

04

Manual dimensions

Build a blank lot and clearly retain user-entered responsibility.

Free to build and preview

Bring the property information. Build the plan with confidence.

No credit card · No CAD experience · Pay when you need a clean export

Start your plan free